欧美性爱一级一级|伊人无码视频四十|91mv无码二区|国产AV香蕉久久久|国产制服另类重口日本欧美|国产精品va在线|在线免费视频无码目本AⅤ性爱视频|波多野结衣无码导航|91久草中文在线|97蜜桃在线视频

Architectural engineering
Weifang traditional Chinese medicine hospital Binhai Branch outpatient complex building
 

The outpatient complex building project of Binhai Branch of Weifang traditional Chinese medicine hospital is one of the key livelihood projects of Binhai Development Zone government. It is located in the community health service center of Yangzi street,
built-up area eight thousand one hundred and thirty-seven point seven M2, building height 16.65m There are four floors above the ground. The first floor is for emergency treatment, pharmacy, medical technology inspection, the second floor is for outpatient service, and the third and fourth floors are for ward.
The project includes fire control, elevator, purification, building energy conservation, building intelligence, etc. the outpatient complex building has complete functions, including emergency, internal medicine, surgery
There are 146 beds, 2 elevator channels, central air conditioning, central oxygen supply, central suction, operating room, emergency 3-way and so on.
From June 5, 2013 to November 10, 2013, the formal drawings of the project were obtained, and the project only lasted for 157 calendar days.